Restoration Update – 10.08.09


After months of removing the 1960’s and 1970’s additions to the Plaza’s facade and interior, we’ve turned the corner and the restoration and re-instatement has begun!
The ceilings and floors from the Patrons Lounge level on the lower ground floor, through what was once the General Managers office on the ground floor and into the Cafe Lounge on the first floor have been removed to make way for the lift shaft and lift which will benefit patrons and grant us far more accessibility to each part of the Plaza.
In the lower ground Patrons Lounge and Gallery, the walls are now going into place, the floors are down and next week the auditorium floor is reinstated defining the two levels.
The wonderful moulded ceilings in the Cafe Lounge are being brought to life by expert plasterers who are recreating exact replicas alongside the remaining sections of this beautiful feature of our home for Stockport finest cafe experience when we reopen.

progress54

progress55

progress56

progress57

progress58

 


Support the Stockport Plaza

Help us to continue our restoration project with a one off donation via JustGiving.

Sponsor A Seat

Share your support for the Plaza Restoration and Maintenance Appeal

Download our latest brochure

Covering all our events

Download

Size8.1MB

FormatPDF